Stop Guessing Your Timeline: Audit Your Embedded Systems Project Feasibility

In 2026, the “move fast and break things” approach is dead. Between component scarcityCRA security mandates, and complex SoC integration, the margin for error has vanished.

Instead

  • Identify team capability gaps before they stall development
  • Predict regulatory bottlenecks (e.g. IEC 62304, ISO 26262, ATEX)
  • Verify whether your hardware and firmware specs are realistically achievable.

Our Project Success Calculator evaluates your technical roadmap against 17+ years of engineering delivery data to ensure your project stays on track.

Project Success Calculator

Identify potential risks in your embedded systems project and receive personalised recommendations from ByteSnap Design's expert engineering team

This assessment methodology is based on over 400 man-years of embedded systems project experience across hardware design, firmware development, FPGA implementation, ATEX compliance, and IoT deployment

Question 1 of 10
Question 1 of 10
Select the option that best describes your primary focus
Wireless communication, cloud connectivity, sensor networks
Hazardous environment equipment, Zone 0/1/2 certification
High-performance processing, IP protection, custom logic
Microcontroller-based system, real-time embedded code
Regulatory compliance required (IEC 62304, ISO 13485, FDA)
Ruggedised design, reliable operation, factory environments
Please select your project type
Question 2 of 10
Understanding your development stage helps identify stage-specific risks
Exploring technical options, initial requirements gathering
Schematic design, PCB layout, firmware architecture, specifications
Building and testing early versions, design validation
Preparing for manufacturing, production transition, pilot runs
Existing project with technical issues, stalled development, performance problems
Please select your development stage
Question 3 of 10
Tight deadlines significantly increase project risk if technical challenges aren't addressed early
Critical deadline, extreme time pressure
Tight deadline, high time pressure
Moderate pressure, typical commercial timeline
Comfortable timeline, allows for proper development
Flexible, quality-focused timeline
Please select your timeline
Question 4 of 10
⚠️ Select all that apply — compliance issues caught late can add months to your timeline
No certification required, development or internal use only
Electromagnetic compatibility, standard CE marking, radio equipment directive
EU Cyber Resilience Act, IEC 62443, EN 18031, ETSI EN 303 645
ISO 26262 functional safety, ASPICE, automotive EMC
Intrinsically safe certification for hazardous areas
IEC 62304, ISO 13485, FDA regulations, clinical trials
Please select at least one regulatory requirement
Question 5 of 10
⚠️ Select all that apply — multiple challenges compound project risk
RF performance, range, interference, antenna design, field deployment
Ultra-low power design, energy harvesting, battery optimisation
Speed, throughput, real-time constraints, computational demands
Energy limitation, fault tolerance, fail-safe operation
Multiple subsystems, complex architecture, legacy system integration
Long product lifecycle, supply chain risk, future availability
Please select at least one technical challenge
Question 6 of 10
Understanding capability gaps helps identify where external expertise adds most value
Need complete design service from concept to production
Mechanical team or other disciplines, limited embedded expertise
Strong PCB design capability, limited embedded software expertise
Strong software team, limited hardware design capability
Capable team but lack bandwidth for additional projects
General capability but lack specific skills (ATEX, FPGA, wireless, etc.)
Please select your team capability level
Question 7 of 10
⚠️ Select all that apply — past issues help predict future risks and inform mitigation strategies
Post-launch problems, product recalls, warranty claims
Certification delays, EMC failures, regulatory submission issues
Scaling problems, yield issues, design for manufacturing challenges
System not meeting specification, inadequate processing power
Budget exceeded, unit cost too high, component pricing problems
Missed deadlines, extended development cycles, late discoveries
Forced redesigns, supply chain disruptions, end-of-life component issues
No prior development experience or past projects were successful
Please select at least one option
Question 8 of 10
⚠️ Select all that apply — competing constraints require careful prioritisation and trade-off management
Launch deadline is non-negotiable, market window is critical
Fixed investment limit, NRE costs are constrained
Must hit target price point, margin pressure
Cannot compromise on performance, reputation risk
Team bandwidth is limited, resource constraints
Willing to invest appropriately for right outcome, no extreme constraints
Please select at least one constraint
Question 9 of 10
Understanding risk tolerance helps prioritise recommendations and mitigation strategies
Product must work perfectly, no room for failure or field issues
Willing to accept some risk with proper mitigation plans
Early-stage product, can iterate and improve post-launch
Please select your risk tolerance
Question 10 of 10
⚠️ Select all that apply — external pressures add complexity and constrain options
Competitors launching similar products, market timing critical
New standards taking effect, compliance deadline approaching
Pre-sold units, contractual delivery dates, customer expectations
Must demonstrate progress for next funding round, investor pressure
Component shortages, long lead times, supplier issues
Project driven by internal roadmap and planning
Please select at least one option

Why Manufacturers Use This Audit

ByteSnap Design’s expert engineering teams have delivered 98% of projects on-time and on-budget since 2008. We apply our project evaluation framework to your specific requirements across:

 
  • Hardware & PCB Layout: For complex electronics and FPGA implementation.

     
  • Firmware: Bare metal, RTOS, and embedded Linux.

     
  • Regulatory Compliance: ATEX (Hazardous areas), IEC 62304 (Medical), and ISO 26262 (Automotive).

     
  • Modern Security: Cybersecurity by design (EN 18031, IEC 62443).

     

Project success calculator FAQs

  • Q: How long does it take?

    5-7 minutes. Answer 10 general questions about your project - no technical documentation required.

  • Q: How technical do I need to be?

    Not very. If you know your project’s goals and high-level requirements, you can complete this. 

  • What do I get at the end?

    An immediate Success Probability Score (0 - 510)  with prioritised risk-mitigation steps.

  • Q: Is my data safe?

    Yes, absolutely. We are ISO 9001:2015 certified. Your project details are treated with professional confidentiality.

Ready to ensure your project's success?

Complete your free assessment now or schedule a technical consultation with our engineering experts